Hi All,
we have a requirement where we need to add the scheduling in the process model as per following:
1. Every day at 00:10 AM BST
2. 12:00 PM BST and
3. Every 4 Hours after 12:00 PM BST
To Summarize - Process should trigger every day at 00:10 AM BST then 2nd time at 12:00 PM BST and then every 4 hours.
Is there any feasible way to achieve this?
Second thing - I need to make this configurable, so that from UI support team can change the scheduling any time.
Thanks
Discussion posts and replies are publicly visible
This is possible by adding multiple number of timers to run the schedule process multiple time. Please check the attachment. However if you want to configure the time through UI, this is possible but it will require to publish the process model each time there is a change.
Click on Setup and check the Show Advanced Options. There should not be any configuration or it should be true.