How to refresh info in Task or load Task with latest info?

Scenario: 

A record type with update button configured. User can updated details on a record, before even taking action on the task assigned to them. How to make sure the Task loads with latest info that they updated outside the task with update button on record type?

1. Is it possible to refresh task? Task interface is a load interface with multiple sections and have not used "with" anywhere in it. 

2. Is it possible to disable the update button in a record type, if a task is assigned to same team for same record?

Preferred solution is question 1. Please advise.

  Discussion posts and replies are publicly visible