Hi, We have complete tempo based application and chaining breaks here

Hi,

We have complete tempo based application and chaining breaks here sometimes.
I know if the time consumed by nodes is more than 8 secs, then it is desirable or it will break even if no of nodes exceeds between two screens.

Is there a way that I can count exact time consumed by each and every node? I tried to check Process Nodes in Process Details, am I on the right track?

Regards,

Anagha...

OriginalPostID-116038

OriginalPostID-116038

  Discussion posts and replies are publicly visible

Parents
  • Eduardo, I looked into the node details for one of the process model where I thought broken chain was the issue and we fixed it. However, when I am trying to see the time taken for optimizing that more, it seems that the addition of all times between two screens is way more than 8 secs and still the chaining does not break. I feel that the time is not shown correctly sometimes or is there a configuration to check that out?
Reply
  • Eduardo, I looked into the node details for one of the process model where I thought broken chain was the issue and we fixed it. However, when I am trying to see the time taken for optimizing that more, it seems that the addition of all times between two screens is way more than 8 secs and still the chaining does not break. I feel that the time is not shown correctly sometimes or is there a configuration to check that out?
Children
No Data