Attempting to set the 31st of December to a non-working day, seems to change the

Attempting to set the 31st of December to a non-working day, seems to change the 1st of December to a non-working day. See screen shots. What am I doing wrong?

OriginalPostID-179321

OriginalPostID-179321

  Discussion posts and replies are publicly visible

Parents
  • WORKAROUND

    1. Log in as a System Administrator
    2. Enable en_US
    3. Make en_US the primary language
    4. Sign out
    5. Log in as a System Administrator
    6. Mark the desired dates as non-working
    7. Save the changes
    8. Disable en_US and make en_GB the primary (if this is the requirement from the customer)
    9. Sign out
    10. Sign in and make sure everything looks good. If not, contact Appian Support asap.
Reply
  • WORKAROUND

    1. Log in as a System Administrator
    2. Enable en_US
    3. Make en_US the primary language
    4. Sign out
    5. Log in as a System Administrator
    6. Mark the desired dates as non-working
    7. Save the changes
    8. Disable en_US and make en_GB the primary (if this is the requirement from the customer)
    9. Sign out
    10. Sign in and make sure everything looks good. If not, contact Appian Support asap.