Hi Team,

I have a process model which has around 5-6 nodes running in a loop. At one go the loop may have more than 1000 items to be run. The process model gets paused by exception after running the loop for 1000th time. Do we have any limit on  number of times a loop can run in one go?

If yes, how can we handle the exception if we have more items than the maximum limit ? After the loop we have few nodes to run which gets stopped as the process model is getting paused.

Appian current version : 21.1. Will soon migrate to 22.2.