I have created a MNI in a user Input task
In the assignment Tab, set the assignment to one to one as well
The above group contains two users. But as soon as one user completes the task, whatever the data filled by that user is showing to the other user as well.
Could you please help me to resolve this error
Discussion posts and replies are publicly visible
For this particular use case the Assignment should be one to one for each instance. Since both the users are member of group they are able to see the task.
Hi Abhay, In the second screenshot attached I have checked the box for the one to one assignment. I hope you're referring this only. But still when one user fills the form with some data, for the other user the data filled by him is displayed.
In the above screen shot, I submitted the task by one user. When other user opened the task he is already seeing data filled by other user.
Could you please suggest on this?
May be try this way take process variable multiple values. save each user input values in index wise.
cons!PS_TEST_GROUP -> is it pointing to group ? If yes then it will be assigned to group not to individual members.
Try this, In your user input configuration don't map the process variables for value in data inputs. Also, in your MNI configuration change the radio button option to move each time an instance finishes.
Hi Abhay, yes it is pointing to group. This task needs to completed by each user.
Hi Naresh, while doing this only the latest data of user is getting stored. I have made the variable as multiple as well.
To debug the issue, try assigning the task to individual user, put both the user names in assignment and see what happens.
Unknown said:then it will be assigned to group not to individual members.
This is incorrect. The configuration noted here specifically will launch an individual task instance for each user of the group.
Is the task set to save to an array? I believe you need to do this (and handle it with unusual care) to get the result you desire.
I suspect what's happening instead is that you're saving the data into a singular PV, and if that PV is also set as the value for the ACP in the data inputs tab, then the next person to load their instance of the task would automatically see the value completed by the prior user.