Question
The report generation was cancelled by the system (APNX-1-4275-008)
I am using process report. Recently I encounter the below error in the log. Can you pls advise on what would be the best option I should follow to remediate this issue without changing the default time limit?
The report generation was cancelled by the system after 2224 ms.The time limit for generating a report is 2000 ms. (APNX-1-4275-008)
