-
Recently active
Hi guys, Is there a new limit to how many rows can be stored in a process variable that is marked as multiple? I made a query that returned 146 elements and the length of the ac!variable is 146 but in the pv!variable there are only 101 elements. Everything after the 101st element seems to have gotten trimmed out.
Hi team, How can I add Environment name detail in Notification/ error email subject? Thanks, Kiran
Hi All, I have a PM wherein im calling few processes- async and sync. The structure is -> Start node-> script task-> sync subprocess -> gateway-> sync subprocess -> start process-> start process-> scrip task and so on.. Every day few instances get error on the first start process(i made it bold ) with the following error Error when parsing process details or variables Also when we restart the node, the process runs without error. We have trd if the variable that we send is not in proper format . We are passing only one cdt pv to this start process. I am not understanding why the error would come, is it coz of the engines beign busy? but why alwasy on the same node? If anyone could make this all sence or give a solution, it will be time saving for us. Thanks in advance.
Can we Trigger a Process Model from a Process Model by running a!startProcess() from script task ?
We have a process model and it contains some scripts and another subprocess between two user tasks all nodes are connected by activity chaining, User sometimes receives "Action is completed" although there is activity chaining and by analysis this happens when the subprocess takes time so by search we found that we have to increase conf.suite.REQUEST_TIMEOUT_IN_SEC in custom.properties so we increased it to 180 but still this behavior happens and the subprocess takes 28 seconds
Hidden process variable is hide from reports other than that is there any other scenarios where we can use those variables?
In 'Complete task' Smart Service, Getting the below error"The process running the task is paused. Task ID: XXXXXXX"In Node Input 'Task Id' the value is pv!taskIdList[tp!instanceindex]'Task Inputs' the value is { autoComplete:"true"}What must be causing the error?
I have a use case where I need to apply visibility rules to requests generated in an application. In other words, if I create a request, only users from my department should be able to see it. In the client’s system, there are many departments, and creating a group for each of them doesn’t seem like the right solution. Additionally, new departments may emerge in the future. As a solution, I’m considering detecting the department code of the user initiating the process (this value is stored in the custom field ‘customfield1’). Then, when applying visibility rules to requests, I would calculate all users who have the same value in ‘customfield1’ as the user who created the request. My question is: Is there any issue in Appian if I assign tasks to an array of users instead of Appian groups?
Currently i am undergoing my training in Appian, where i am working on a POC named Upload Document App. I am facing issue in a process modeler where it is showing please select a record with data sync enabled. I have already synced it but it shows the error again can you help me with the problem.What I did in this application so far was uploading documents . Now what I am doing is I created a record type UDA Review so that to review the document. In that I added reviewer for reviewing the document. So I am stuck at place where i want to assign the document to the reviewer so i created process model and i am getting the error. I am providing screen shots. So kindly help me to solve this problem.
Hi All, Can anyone confirm the format when I want to select only a set of months, I used = {1,4,7,10} for January, April, July and October But not sure if this is the correct format for the monthly timer recurrence. Thanks in advance
Hi Team, I have recently deployed a new version of CDTs to my staging environments along with multiple other objects, the newly added Object are referring to latest version of the CDT however there are multiple process which are still pointing to CDT which is 4 version older. What could be the reason behind this issue ? I tried to find if there are objects depending on older version of the CDT but nothing as such in the warning from CDT. We are not supposed to manually map the latest version of CDTs in the staging environments and when we are trying to compare and deploy these objects from Dev they are getting ignored as No change is detected in theses objects. Please Advise. Thanks, Gaurav Singh
Hi, I have a page in my site that has a grid with cases and on click of case id which has the process start link and that navigated to a user input Task interface. My requirement is that from an email, I want the caseid to trigger process and navigate to the user input interface in the site. How can i get this done? How can I get that process link?
hi everyone, I get an error that i don't understand when i am trying to save or publish my process , it is throwing an error of type "The process Model contains a node without a name in the site primary language :HEBREW ERROR " for each node that i created on the modeler. nowa few days ago i went in the admin console to see the optional languages that we can choose , and i choose hebrew back then. BUT I DESELECTED the language and save the changes. SO why is it throwing this error ? i dont understand why it is blocking me to save the process that i built ?? what i need to do ? Thank
Hi All, This is the setup I have for my start node timer - if I change the selection for daily or weekly it works fine and saves, but for monthly is not letting me save. I want it to run the last Sunday of every month. Has anyone faced this issue before? Thanks in advance
Hi Everyone, I have a requirement to send a reply email using Appian. Generally, I receive emails using the mail poller plugin in my system, and later I display them in the interface. Now, users need to send a reply email. Is it possible to send a reply email in Appian that is linked to the original email's thread? If not, are there any workarounds? Thanks. [mention:a11f77a729fb4db2af76b09948583328:e9ed411860ed4f2ba0265705b8793d05] [mention:b45a4f6a20b14a008e4e0ec732a8bf98:e9ed411860ed4f2ba0265705b8793d05]
How can we remove/delete the current working draft version of the Process Model so that it reverts to the last published version and removes all changes done in the draft version? If we load the last published version, we need to save and publish it again. It will create an unnecessary new version. Hence, looking for any other option if available. Please suggest if there is any other way to do this.
Hi, we need to centralize the opening of an incident (on an external system) following an error found within the Appian platform. From the documentation it emerges that it is impossible to recover the information of a process that has failed in an unhattended node. In the various support functions the tasks with problems are counted, but the unhattended nodes are not shown. Furthermore, the process status is active. Is there some method that we have not taken into consideration? Unfortunately Appian Support was unable to resolve this issue.
Can anyone tell me the limit for the number of basic user accounts created in Appian?
When the same process variable is updated by both the input and output of a 'user input task' what will be the result? From what I have tested, the input takes precedence. As implemented in the attached photo, the initialization set in the output (setting to NULL) does not execute. /resized-image/__size/640x480/__key/communityserver-discussions-components-files/14/_B930AF30EA30FC30F330B730E730C330C830_-2024_2D00_06_2D00_14-153006.png
I have an requirement as to rotate the document in IDP reconciliation task. some times documents are coming upside down, it makes user to difficult to extract the data. Can we have a feature in IDP reconciliation task for rotating the documents as same as which is in Classification task? any suggestions would be appreciate. Classification task have Rotate document option. But In Reconciliation task, we don't have that option
For line 6, "In the Node Inputs pane, click Records I do not see that here on my application. What am I doing wrong here?
You created and published a new process model. The process model has a start form with two synchronous subprocesses with 40 and 66 nodes each. All nodes are chained from the start node through the subprocesses to the end node. After the tasks and subprocesses, there is a second User Input Task in which the user can confirm the entries and add a comment. When testing as a normal Acme business user, you see that the confirmation screen is not shown to you. What might be the reason for this behavior?' A. Maximum number of activity chained Node is exceed and breaks B. The second User Input Task is assigned to the process Initiator C. the second User Input Task is assigned to the ACME Business user group it should be A or B confused on this
I am receiving an alert mail saying "A task is unassigned". Does anyone know how to resolve this? This error email occurs only in the production environment and cannot be reproduced in the development environment, so I would like to get as many clues as possible.
My company has an application that has grown in size over the past few years. The main functionality is to create an estimate for a customer for work. When we create a new estimate, we kick off an orchestration process model that then chains through subsequent process models and directs the user from User Input task to User Input task. As sub processes start and end, they each have a 1 day deletion clean up. At the end of the business flow, once the estimate and work is done, the user closes the estimate and the orchestration model ends. Throughout the lifespan of the estimate, it is constantly going in and out of process models.I understand that Appian is moving towards and giving advice to move away from this type of architecture and move more to a record centric approach, but for us, that would be a large undertaking, and thought it may be on the radar down the road, I'm more so looking for feedback/answers regarding the currently situation. So my question is this, here'
There are two applications Application A and Application B. Application A has Group A and Application B has Group B. First the task is assigned to Group A. When a user from Group A completes the task then the task should be assigned to Group B which is in Application B. How can we do that?
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.